A 100-acre stormwater detention basin has been transformed into a nature-based regional park without compromising its flood-control function. Formed from earth excavated to create the original detention basin, the 60-foot mound became the organizing feature of the park, crowned by a hilltop pavilion with panoramic views across Houston. Nearly 325 million gallons of storage capacity now coexist with almost five miles of trails, fishing, outdoor learning, and public art. Approximately 9 acres of native habitat were protected or restored, with 80% of plant material native to the region. Weathering steel, limestone, native meadows, and sculptural forms reinforce a rugged material language. A 600-foot pedestrian bridge crosses Sims Bayou to connect directly with nearly 20 miles of regional greenway trails. Shaped through more than a dozen community meetings and input from over 700 residents, the project brings recreation, nature, and regional connectivity to a community receiving its first new greenspace in nearly 50 years.