Administration and production building syNeo cosmetics

  • Prize
    Honorable Mention in Architectural Design / Industrial
  • Design Company
    Gaus Architekten
  • Lead Designer
    Christian Gaus
  • Design Team
    Gaus Architekten
  • Architecture Firm
    Gaus Architekten
  • Interior Designer
    Christian Gaus
  • Photo Credit
    Oliver Rieger
  • Project Location
    Albershausen
  • Client
    Brunner Besitz Gbr
  • Project Date
    2024

Now in its third generation, syNeo cosmetics is experiencing strong growth. As the existing headquarters no longer offers sufficient capacity for the company’s further development, a modern, sustainable, and future-oriented site was developed in collaboration with the Brunner family.
The new location includes a three-story administration building and a two-story warehouse and production hall with a green flat roof. A central joint connects both parts and houses the cafeteria.
With 74 meters in length and 55 in width, the new building offers ample space for expansion. The ground floor of the administrative wing contains a reception area, changing rooms, sanitary facilities, a bicycle storage room, and a garage. The upper floors accommodate offices, training rooms, technical rooms, an archive and a kitchen, as well as a viewing platform overlooking the production area. High hygiene standards are ensured throughout due to cosmetic manufacturing.
The building components are constructed using solid and semi-prefabricated methods, with natural lighting provided by shed roof elements. The outdoor areas are designed to blend harmoniously into the surrounding landscape.




BLT Built Design Awards 2025
Privacy Overview

This website uses cookies so that we can provide you with the best user experience possible. Cookie information is stored in your browser and performs functions such as recognising you when you return to our website and helping our team to understand which sections of the website you find most interesting and useful.