ILIRIJA is a 34,620 m² Olympic swimming complex with sport facilities under a single 12,000 m² steel roof.
SUSTAINABLE URBAN REGENERATION
Ilirija turns a brownfield between railway tracks and main roads into an open public space. It reconnects the city with Tivoli Park via Latterman Avenue, 83 years after the railway relocation cut it off.
HERITAGE REUSE
The 1929 entrance building was preserved. Refurbished, it achieves net-negative CO? emissions (?11 kg/m²a).
AMONG THE FIRST NEARLY ZERO-ENERGY POOLS
Geothermal heat pumps provide heating and cooling. 4,500 m² rooftop photovoltaics (600 kWp) generate electricity on site, and surplus power is fed back to the grid. Renewables cover 100% of primary energy demand.
NEARLY ZERO EMISSIONS
The 14,000 m² pool building reaches energy class A2, with heating demand of only 11 kWh/m²a. Its primary energy demand of 117 kWh/m²a is less than half the 263 kWh/m²a nZEB reference value. CO? emissions: just 1 kg/m²a.
ROOF AS POWER PLANT
The floating roof unites three volumes and carries the solar plant.
MULTIFUNCTIONAL, 15-MINUTE CITY
One efficient building serves sport, events and public life in the city centre, so no new land is consumed.